As the largest HRSG R&D and manufacture base in China, HBG is
always top-ranking for design and manufacturing of waste heat
boiler, especially for the HRSGs with complicated structure and
difficult fabrication.
HBG also has strong design and manufacturing experience in
gasifier, waste heat boilers, radiate /convection waste heat
boilers, cooling tower, methanol synthetic reactor and other
chemical container of coal chemical industry field, and CCPP flied
as well.
HBG designed and manufactured one unit of hot water saturation
tower for Jiangxi Second chemical factory in 1992 with diameter of
3 meters and length up to 32 meters.
In 2006, HBG entered into an agreement with Hang Zhou Linda
chemical company, for the supply of 180000T/YEAR methanol synthetic
reactor shell with diameter 3.4M, thickness 138mm, length 10m,
loading capacity 12Mpa and total weight 180 ton.
In early 2006, HBG commenced IGCC pre-stage research, mainly
focused on gasifier/waste heat boiler of gasifier island module and
GT&ST combined cycle equipment of GT island module. HBG has
actively involved in several IGCC and coal chemical projects so
far, and set up comprehensive communication with Xi’an
Thermotechnical Institute, Chinese Academy of Sciences,
SINOPEC(Nanjing) Institute, ECUST East China University of Science
and Technology and Chemical Engineering Design Institute. The new
plant dedicated to heavy chemical equipment is now under
construction.
Internal of gasifier
Gasifier
IGCC flow chart